ALL CONSTUCTION IS COMPLETE
All construction on the water system is complete on Modoc Loop, Uintah View Drive, Salt Box Circle and Navajo Road. Water is restored to all these locations as of 11/3/06. We would like to thank everyone for their patience and cooperation during all constuction.